Westin St. John, Virgin Islands
Evaluation and subsequent replacement of wood shake roofs with standing seam metal panels. Climatic as well as aesthetic considerations eventuated in the selection of the roofing materials.
Evaluation and subsequent replacement of wood shake roofs with standing seam metal panels. Climatic as well as aesthetic considerations eventuated in the selection of the roofing materials.
New construction coupled with inspections of previously existing roofs with budgetary and repair considerations. The flat roofs were a single ply with tile used on the decorative mansard areas.
Evaluation of roofing systems on numerous buildings after the property was acquired to determine the long term budgeting for repairs and replacement.
New construction of time share buildings currently being developed with laminated fiberglass shingles.
New construction of the final expansion along with phased reroofing of the remainder of the various roofs within the complex. The project was phased out over eight years to accomodate many variables. Coal tar pitch was used on the flat roofs to achieve the longest life expectancy possible.
Inspection and budgetery projections for the Owners association to help with the long term planning and a more realistic and updated replacement cost estimate.
This new construction project that involved the design and installation of complex roofing systems and flashing details. Numerous in-process inspections were required during the long construction period.
This clay tile roofing system was involved in a lawsuit. Inspection revealed installation errors that were not roof repairable. Removal and replacement of the entire roof was required.
New construction for Starwood Properties in conjunction with Kerzner International. The roofs are a combination of standing seam metal panels and single ply modified bitumen on the flat areas.
Replacement of various roofing systems after hurricane damage as well as the inspections of all new roofing systems on the Phase III expansion for Kerzner international, the developer and owner of the resort.
New construction with roofing and siding installation. EPDM was selected for the flat roof with Hardy siding used on the vertical walls.
Evaluation and subsequent replacement of old wood shake roofs with standing seam metal panels. Climatic as well as aesthetic considerations evented in the selection of the roofing materials.